Musi River Hydro

Musi River Hydro

Notice: Per State of California Legislation AB1305, entities residing in California are temporarily prohibited from buying Carbon Credits via this website. Instead, please email your purchase inquiry to: sales.northamerica@southpole.com.

Musi River Hydro

As low as €6.00 /tCO₂e
Renewable hydropower for the island of Sumatra
Availability:
Only %1 left

Project Overview

Sumatra, Indonesia’s largest island, is covered by dense tropical forests that are home to countless plant and animal species. Its fertile soil is ideal for growing rice and other commodities such as coffee, cacao, cinnamon, and palm sugar. Despite this, new economic opportunities are limited by rudimentary infrastructure and poor electricity access – and growing energy demands threaten Sumatra’s unique natural ecosystems.

Solution Description

This grid-connected, run-of-river hydroelectricity plant is built on the upper banks of the Musi River near Sumatra’s port city of Bengkulu. By harnessing the kinetic energy of powerful running water, the Musi River Hydro plant has a total-installed capacity of 210 MW and delivers over 765,000 MWh to Sumatra’s grid every year – that’s enough to meet the demands of over 700,000 Indonesians on average each year!

Sustainable Development Goals

7 - Affordable and Clean Energy

765,000 MWh of clean energy

generated on average annually by the hydro plant, displacing fossil fuel-generated electricity and boosting Indonesia’s renewables sector

8 - Decent Work and Economic Growth

50 permanent jobs

created in power plant operations, with part-time employment opportunities offered during the construction phase

9 - Industry, Innovation and Infrastructure

2 draw bridges repaired

as well as new roads, trash basins, and financial support building a public transport terminal, mosque, and a traditional marketplace

12 - Responsible Consumption and Production

Free training for locals

on composting and making organic fertiliser from invasive aquatic plants – providing free fertilisers to farmers to maintain healthy ecosystems

13 - Climate Action

568,000 tonnes of CO2e

reduced on average annually, contributing to climate change mitigation

15 - Life on Land

20 hectares of land reforested

in the project area, as part of a dedicated programme to support a healthy, natural ecosystem

Impact

This project addresses issues in rural Sumatra such as poor electricity access and the lack of quality employment opportunities – as well as fostering sustainable economic development. The Musi River Hydro plant has created quality jobs and upskilling opportunities for locals in what has been traditionally a farming community. A portion of project revenue is reinvested in the local community, building an orphanage, constructing new roads, bridges, and a traditional marketplace – giving local farmers better access to their rice paddies and the opportunity to pursue additional income. A reforestation program has also been established in the surrounding catchment area to safeguard the natural landscape.

Project Information

Project Name
VCS487 210 MW Musi Hydro Power Plant, Bengkulu
City
Kepahiang
Country
Indonesia
Solution Type
Large Hydro (>15 Mw)
Methodologies
CDM-ACM0002-Grid-connected electricity generation from renewable sources
Project Partner
PT PLN (Persero)
Scale
Large scale
Grouping
Single Project
Sectoral Scope
Energy (renewable/non-renewable)
Standard
VERIFIED CARBON UNIT
Registries

Vintage

In carbon credits, a "vintage" indicates the year a specific amount of CO2 (measured in tonnes) was successfully reduced or removed from the atmosphere.
2019

344146.6 tCO2e